Munsel Creek Bike Path - Prompt Fix!

Almost impossible to see STOP sign

 Public works did an excellent job in trimming the brush around the STOP sign
Problem got reported and fixed at the same day! Thanks!!!!

Monday, June 27, 2011

12th Steet Trail update

12th St trail connecting Kingwood and Rhody Drive
in the works below and finished trail above

Sunday, June 26, 2011

Rhododendron Drive: New Sign!

Added sign 
BICYCLES AND PEDESTRIAN ON ROADWAY
on Rhody Drive

Monday, June 20, 2011

ODOT improvement on HWY 101

Excellent thinking! This should make it very clear to every driver: Bicycles are LEGAL on bridge roadway

Our thanks to Oregon Department of Transportation for installing there signs on both sides of the bridge.

Friday, June 10, 2011

Munsel Creek Bike Path/Spruce Street crossing

The STOP signs are a good idea but please lower them so they are more visible for cyclists.


Answer from Public Works Director Mike Miller on June 14th 2011:
Typically post-top sign mounting height is the same as on a roadway (7-foot minimum) with the exception that it can be as low as 4-feet to the bottom of the sign. I prefer the 7-foot for ADA clearance in this case because someone with limited vision could wander off of the path. This is also the preference of our traffic engineer (Damien Gilbert with Branch) as well as others that I have worked with in the past.

Sunday, June 5, 2011

Dangerous Storm Drains again II

Dangerous storm drains where reported a while ago. Some "adjustments" were done but please talk to your local cyclists if you don't know what you are doing.
We did not want bicycle stands!
This kind of stands are known as "wheel bender"



Thursday, June 2, 2011

PAC at Work

Members of the Florence Project Advisory Committee (PAC) on a field tour.

Project Advisory Committee meetings are open to the public, and we encourage those interested in the project to attend and provide feedback/input.

Florence Transportation System Planhttp://sites.kittelson.com/FlorenceTSP